Final exam
Lean Six Sigma Basics
Before you start
- 20 questions, drawn at random from a pool of 32.
- Pass mark: 70%. Your final score is 30% practice + 70% exam.
- No time limit, but finish within 3 hours. You can move between questions before you submit.
- Failed? Review the lessons and try again: every attempt gets a new set of questions.
Question 1 of 20Choose one
Which pairing correctly describes the main focus of each approach?
Question 2 of 20Put in order
Arrange the phases of the Six Sigma improvement roadmap.
Drag the items, or use the arrow buttons, to put them in order.
- Measure
- Analyze
- Improve
- Control
- Define
Question 3 of 20True or false
In Lean thinking, a required regulatory inspection that customers would not pay for is classed as business non-value-added.
Question 4 of 20Match the pairs
Pair each office example with its type of waste.
Tap an answer, then tap the place where it belongs (or drag it there).
- Three people approve a $20 purchase
- An expert analyst spends her day reformatting spreadsheets
- 2,000 unprocessed applications sit in a queue
- A form sent back because the signature is missing
Question 5 of 20Choose one
Toyota considered which waste the worst, because it tends to create many of the others?
Question 6 of 20Work it out
A line runs two 8-hour shifts, each with 40 minutes of breaks, and customers need 880 units per day. What is the takt time in seconds?
Question 7 of 20Work it out
A permit office has 360 applications in progress and approves 30 per day on average. What is the average lead time in days?
Question 8 of 20Work it out
An order has 90 minutes of value-added work and a total lead time of 3 days of 10 working hours each. What is its process cycle efficiency in percent?
Question 9 of 20Match the pairs
Pair each Lean tool with its purpose.
Tap an answer, then tap the place where it belongs (or drag it there).
- 5S
- Kanban
- Poka-yoke
- SMED
Question 10 of 20True or false
In a pull system, upstream steps produce as much as they can and send it on regardless of downstream needs.
Question 11 of 20Spot the mistake
Tap the two parts of this draft problem statement that should be removed.
Question 12 of 20Choose one
What is the main purpose of a SIPOC diagram early in a project?
Question 13 of 20Sort into groups
Sort these features of a food delivery app using the Kano model.
Tap an item, then tap its group (or drag it there).
Question 14 of 20Fill in the blanks
Fill in the blanks
Before collecting data, a team writes an for each measure so that everyone counts the same way, and checks the measurement system with a study.
Question 15 of 20Work it out
An insurer checks 250 claim forms, each with 8 opportunities for a defect, and finds 50 defects. What is the DPMO?
Question 16 of 20Work it out
A process has four steps with yields of 98%, 95%, 99% and 90%. What is the rolled throughput yield in percent? (One decimal place.)
Question 17 of 20Choose one
According to the standard sigma table, about how many defects per million opportunities does a 4 sigma process produce?
Question 18 of 20Sort into groups
Sort each project measure by data type.
Tap an item, then tap its group (or drag it there).
Question 19 of 20Work it out
Delivery times are roughly normal with a mean of 30 minutes and a standard deviation of 5 minutes. Up to how many minutes do nearly all (about 99.7%) deliveries take?
Question 20 of 20Work it out
A tablet must weigh between 198 mg and 202 mg. The process mean is 200 mg and the standard deviation is 0.5 mg. What is Cp? (Two decimal places.)
Question 21 of 20Choose one
A process has Cp = 1.5 and Cpk = 0.8. What does this tell you?
Question 22 of 20What would you do?
What would you do?
An operator adjusts a machine's settings after every part that measures slightly above or below target, even though all parts are well within the control limits. Variation seems to be getting worse. What is happening?
Question 23 of 20Sort into groups
A team investigating wrong dosages in a pharmacy brainstorms causes. Place each in its fishbone category.
Tap an item, then tap its group (or drag it there).
Question 24 of 20Work it out
Of 500 customer complaints, 210 concern wrong orders, 140 late delivery, 80 rude service, 40 packaging and 30 other. What cumulative percentage do the top two categories represent?
Question 25 of 20True or false
A strong correlation between two variables is enough to prove that one causes the other.
Question 26 of 20Choose one
A hypothesis test comparing defect rates from two suppliers gives a p-value of 0.01. Using the usual 0.05 threshold, what should the team conclude?
Question 27 of 20Work it out
In an FMEA, a failure mode is rated severity 9, occurrence 3 and detection 4. What is its risk priority number?
Question 28 of 20Choose one
Which improvement is the strongest response to a verified root cause of order-entry errors caused by a free-text product code field?
Question 29 of 20Work it out
A control chart has a center line of 75 and a standard deviation of the plotted statistic of 4. What is the lower control limit?
Question 30 of 20Select all that apply
Which patterns on a control chart usually signal a special cause? Select all that apply.
Select all that apply.
Question 31 of 20What would you do?
What would you do?
Six months after a successful project cut invoice errors by 70%, error rates are creeping back up. Training for new hires never mentions the new checks, and nobody looks at the error chart anymore. What was most likely missing?
Question 32 of 20Choose one