Iteration and Learning from Failure

See how engineers learn from failed tests and famous disasters, use the five whys to find root causes and plan each iteration around evidence.

Step 1 of 11Learn

A bridge that danced

On November 7, 1940, the newly opened Tacoma Narrows Bridge in Washington State twisted itself apart in a wind of roughly 64 km/h. The deck had been designed to be unusually slender and shallow, which made it elegant and cheap. But in steady wind it began to twist back and forth in larger and larger swings until cables snapped and the center span fell into the water. Nobody died, though a dog trapped in a car did.

Engineers studied the failure closely. They learned that wind could feed energy into a flexible structure through its own motion, an effect called aeroelastic flutter. After Tacoma, suspension bridges were tested in wind tunnels with scale models, and decks were made stiffer and more aerodynamic. The replacement bridge, opened in 1950, had a deep, stiff truss deck and still stands.

The lesson is uncomfortable but powerful: failure is information. Every collapsed bridge, recalled product and crashed rocket teaches engineers something that can be built into future designs and standards. Professional engineering codes are, in a sense, a long list of lessons learned the hard way.

You'll fail too, on a much smaller scale, every time a prototype breaks. The question is whether you learn the right lesson.

Step 2 of 11Timeline

Tacoma Narrows: from failure to better bridges

  1. July 1940
    Bridge opens

    A slender, shallow deck: elegant and cheap.

  2. Nov 7, 1940
    Collapse in a 64 km/h wind

    Twisting motion grows until cables snap.

  3. 1940s
    Wind-tunnel studies

    Engineers learn about aeroelastic flutter and start testing scale models.

  4. 1950
    Replacement opens

    A deep, stiff truss deck. It still stands.

  5. 2007
    Second parallel bridge

    Built using decades of lessons in suspension-bridge design.

Step 3 of 11Practice · Choose one

What was the main engineering lesson from the Tacoma Narrows Bridge collapse?

Step 4 of 11Learn

Find the root cause with the five whys

When a prototype fails, the first explanation is usually a symptom, not the cause. "The glue joint broke" tells you where, not why. Fixing only the symptom (adding more glue) may move the failure somewhere else.

A simple tool is the five whys: keep asking "why?" until you reach a cause you can actually fix.

  • The bridge collapsed at 9 kg. Why? The joint at the center snapped.
  • Why? It carried more force than the other joints.
  • Why? The load was applied right at that joint and the top beam bent downward.
  • Why? The top beam was thin and flat, so it wasn't stiff enough.
  • Why? We oriented the sticks flat to save time instead of on edge.

The root cause is a design choice about stick orientation, which you learned two lessons ago makes a huge difference to stiffness. The fix is to turn the sticks on edge or add a deeper truss, not to pile on glue.

Five is a guideline, not a rule. Sometimes you reach the root cause in three whys, sometimes seven. Stop when the answer points at something you can change in the design or process.

Step 5 of 11Practice · Diagram

Five whys on a broken bridge joint

Which box is only a symptom?

Tap the shape that answers the question, then press Check.

Five whys on a broken bridge jointProcess diagram: The glue joint broke → It carried the whole load → Load ran through one stick → No diagonal bracing → Root cause: no triangles.The glue joint brokeIt carried the wholeloadLoad ran through onestickNo diagonal bracingRoot cause: notriangles
The glue joint broke

Where it failed, not why.

It carried the whole load

Why? The load had only one path.

Load ran through one stick

Why? Nothing shared the load with neighboring members.

No diagonal bracing

Why? The design used rectangles, which can rack.

Root cause: no triangles

Fix: add diagonals so the truss shares load. More glue would only move the failure.

Step 6 of 11Practice · Put in order

A drone prototype keeps drifting left. Put this five-whys chain in order, from the symptom to the root cause.

Drag the items, or use the arrow buttons, to put them in order.

  1. The left motors get less voltage
  2. The left wires are longer and thinner than the right ones
  3. The left motors spin slower than the right motors
  4. The wiring layout was never planned in the design
  5. The drone drifts left during hover

Step 7 of 11Learn

Planning each iteration

Iteration only works if each round is deliberate. A useful loop:

  1. Review the data. Which specs passed, which failed, and by how much?
  2. Find root causes for the biggest failures.
  3. Change one or a few things. If you change ten things at once and performance improves, you won't know which change helped, or whether one of them made things worse.
  4. Predict the effect. "Turning the top sticks on edge should raise failure load from 9 kg to at least 15 kg." A prediction makes the next test meaningful.
  5. Test again the same way so the results are comparable.
  6. Record everything, including what didn't work.

Notice the parallel with fair testing: in each iteration, the design change is your independent variable.

Iteration can't go on forever. Projects have deadlines and budgets, so teams decide when a design is good enough: every constraint met, key criteria at target, and the remaining improvements small compared with their cost. Engineers sometimes call the point of diminishing returns the moment when "better becomes the enemy of done."

The vacuum cleaner inventor James Dyson has said he built over 5,000 prototypes before his first bagless design worked. Few projects need that many, but the habit behind it, small changes tested systematically, is what turns a rough idea into a reliable product.

Step 8 of 11Practice · Chart

Failure load across iterations

Which iteration produced the biggest single improvement?

Tap the point that answers the question, then press Check.

Failure load across iterationsLine chart with 6 categories: v1: Failure load 9 kg, Target 16 kg; v2: Failure load 15 kg, Target 16 kg; v3: Failure load 17 kg, Target 16 kg; v4: Failure load 18 kg, Target 16 kg; v5: Failure load 18.5 kg, Target 16 kg; v6: Failure load 18.7 kg, Target 16 kg.0 kg5 kg10 kg15 kg20 kgv1v2v3v4v5v6
Illustrative: big early gains, then diminishing returns.
Failure load across iterations
ItemFailure loadTarget
v19 kg16 kg
v215 kg16 kg
v317 kg16 kg
v418 kg16 kg
v518.5 kg16 kg
v618.7 kg16 kg

Step 9 of 11Note

Step 10 of 11Practice · True or false

If you change many parts of a prototype at once and it performs better, you know which change caused the improvement.

Step 11 of 11Practice · What would you do?

What would you do?

Your solar-powered fan prototype turns too slowly. In one afternoon you could (1) replace the motor, rewire everything, add a bigger panel and change the blade shape, then test once, or (2) test with a bigger panel first, then try other changes one at a time. Which plan is better?