Assessing Risk
Rate likelihood and severity on a risk matrix, decide what needs action first, and avoid the common errors that make risk assessments useless.
Welcome back!
Step 1 of 12Learn
Not every hazard deserves the same attention
A hardware store manager makes a hazard list and finds 40 items: from a slightly frayed doormat to forklifts moving pallets above customers' heads in the aisles. Fixing all 40 tomorrow is impossible. Which come first?
Risk assessment answers that question. For each hazard, you estimate two things:
- Likelihood: how probable is it that the hazard causes harm, given how often people are exposed and what controls already exist?
- Severity: if harm happens, how bad is the realistic worst outcome?
Combining them gives a risk rating. The forklift scores high on severity (a falling pallet can kill) and moderate on likelihood (it operates near customers every day). The doormat might cause a trip, but the realistic outcome is minor and a new mat costs $30. Both get fixed, but the forklift gets fixed first and with stronger measures.
A risk assessment is not paperwork for its own sake. It is a decision tool: what do we fix first, and how strong does the fix need to be?
Step 2 of 12Practice · Diagram
Likelihood and severity, simplified
The full tool uses a 5 × 5 grid, but four quadrants show the logic.
Tap the quadrant that needs action first.
Tap the shape that answers the question, then press Check.
- Rare but severe
A pallet falling from a high rack. Low likelihood does not excuse weak controls when the outcome could be fatal.
- Likely and severe
Forklifts moving pallets over customers’ heads. Act now.
- Rare and minor
Manage with routine housekeeping.
- Likely but minor
A slightly frayed doormat: fix it soon, but it is not the first priority.
Step 3 of 12Learn
The 5 × 5 risk matrix
The most common tool is a risk matrix. Each axis has a scale, often 1 to 5:
| Score | Likelihood | Severity |
|---|---|---|
| 1 | Rare: could happen but almost never does | Negligible: no treatment needed |
| 2 | Unlikely: has happened somewhere in the industry | Minor: first aid |
| 3 | Possible: could happen here occasionally | Moderate: medical treatment, days off |
| 4 | Likely: will probably happen at some point | Major: serious injury, hospitalization |
| 5 | Almost certain: expected to happen | Catastrophic: death or permanent disability |
Risk score = likelihood × severity, giving a number from 1 to 25. Organizations then set bands, for example:
- 1–4 Low: manage with routine procedures
- 5–9 Medium: plan controls and review
- 10–16 High: act soon, with senior attention
- 20–25 Extreme: stop the activity until risk is reduced
Exact band limits vary by company. What matters is consistency: everyone in the organization should score the same hazard roughly the same way, and the bands should trigger clear actions.
Step 4 of 12Try the calculator
Risk score calculator
Score a hazard from 1 to 5 on each axis. The band shown uses the example limits from the lesson: 1 = low, 2 = medium, 3 = high, 4 = extreme.
- Risk score
- 12
- Band (1 low, 2 medium, 3 high, 4 extreme)
- 3
Step 5 of 12Practice · Work it out
A hazard is rated likelihood 2 (unlikely) and severity 5 (catastrophic). What is its risk score on a 5 × 5 matrix?
Step 6 of 12Note
Step 7 of 12Learn
Reassessing after controls
A risk assessment has two scores for each hazard: before controls (inherent risk) and after controls (residual risk).
Take a loading dock where workers sometimes walk behind reversing trucks. Before controls: likelihood 3, severity 5, score 15 (high). The team adds three controls:
- A painted, barriered pedestrian walkway that keeps people away from the reversing area (engineering)
- A rule that a trained spotter guides every reversing truck (administrative)
- High-visibility vests for everyone on the dock (PPE)
After controls, the severity stays 5, because a truck can still kill someone. But likelihood drops to 1. Residual score: 5 (medium). The team decides that's acceptable with monthly checks that the walkway and spotter rule are actually used.
Two lessons from this example:
- Controls usually lower likelihood, not severity. Severity drops only when you change the hazard itself, like slower speed limits or lighter loads.
- Residual risk must be monitored. A walkway blocked by pallets or a spotter skipped "just this once" quietly pushes the score back up.
Review assessments when something changes: new equipment, new people, a near miss or an incident.
Step 8 of 12Chart
The loading dock, before and after controls
The walkway, spotter and vests cut the score from 15 to 5. Look at which bar did not move.
Step 9 of 12Practice · True or false
Adding high-visibility vests on a loading dock usually lowers the severity score of being hit by a truck.
Step 10 of 12Practice · What would you do?
What would you do?
A small print shop scores its guillotine paper cutter at likelihood 3 and severity 4 (score 12, high). The owner proposes adding a sign saying "Keep hands clear" and moving on. What is the best response?
Step 11 of 12Practice · Match the pairs
Match each risk score (likelihood × severity) to its band in the example scheme.
Tap an answer, then tap the place where it belongs (or drag it there).
- L2 × S2 = 4
- L2 × S4 = 8
- L3 × S4 = 12
- L5 × S5 = 25
Step 12 of 12Practice · Choose one
A warehouse lowers the speed limit for forklifts from 10 mph to 5 mph in pedestrian areas. Which part of the risk score does this most directly reduce?
Lesson complete!