Find a course

Module 4: Inventory ManagementLesson 8 of 1214 min

Order Quantities, Reorder Points and Safety Stock

Calculate the economic order quantity, set reorder points and size safety stock for a target service level, using live charts and calculators.

Step 1 of 13Learn

How much to order: the EOQ

A hardware distributor sells 12,000 boxes of screws a year. Each order costs $50 to place and receive (paperwork, freight setup, inspection). Holding one box for a year costs $3. Should it order 12,000 boxes once, or 1,000 boxes every month, or something else?

Ordering big means few orders but lots of stock; ordering small means little stock but many orders. The economic order quantity (EOQ) finds the order size that minimizes the sum of the two:

EOQ = √(2 × D × S ÷ H)

where D is annual demand in units, S is the cost per order, and H is the yearly holding cost per unit.

For the screws: EOQ = √(2 × 12,000 × 50 ÷ 3) = √400,000 ≈ 632 boxes. That's about 19 orders a year (12,000 ÷ 632).

At the EOQ, yearly ordering cost and yearly holding cost are equal. Ordering cost = (D ÷ Q) × S = 19 × $50 ≈ $949. Holding cost = (Q ÷ 2) × H = 316 × $3 ≈ $949. The average inventory is Q ÷ 2 because stock falls from Q to zero before each new delivery.

The EOQ curve is flat near the bottom: ordering 500 or 800 instead of 632 raises total cost only slightly. So round to a sensible pack or pallet size and don't obsess over precision.

Step 2 of 13Explore

EOQ total cost explorer

The curve shows yearly ordering plus holding cost for each order quantity Q on the horizontal axis. Move the sliders and watch the lowest point shift.

02,0004,0006,0008,000 5001,0001,5002,0002,500
EOQ
632 units
Orders per year at EOQ
19
Minimum total yearly cost
1,897 $

Step 3 of 13Practice · Work it out

A shop sells 2,000 units a year. Each order costs $40 and holding one unit for a year costs $4. What is the EOQ?

Step 4 of 13Practice · True or false

If the cost of placing each order goes up, the economic order quantity goes down.

Step 5 of 13Learn

When to order: the reorder point

EOQ answers how much. The reorder point (ROP) answers when: the stock level at which you place a new order so it arrives before you run out.

If demand and lead time were perfectly steady:

ROP = average daily demand × lead time in days

A shop selling 40 units a day from a supplier with a 5-day lead time should reorder when stock falls to 40 × 5 = 200 units. By the time the stock reaches zero, the new delivery arrives.

Real demand isn't steady. Some weeks are busy, and suppliers are sometimes late. So we add a cushion:

ROP = (average daily demand × lead time) + safety stock

With 60 units of safety stock, the shop reorders at 200 + 60 = 260 units. The safety stock is only used when demand during the lead time is higher than average or the delivery is late. On a typical cycle, the new order arrives with about 60 units still on the shelf.

This approach, where stock is watched constantly and a fixed quantity is ordered whenever it hits the ROP, is called a continuous review or (Q, R) system. Many retail and warehouse systems trigger these orders automatically.

Step 6 of 13Practice · Work it out

A pharmacy uses 30 boxes of a bandage a day. The supplier's lead time is 6 days, and the pharmacy keeps 45 boxes of safety stock. At what stock level should it reorder?

Step 7 of 13Practice · Chart

The inventory sawtooth

A shop sells 40 units a day, lead time 5 days, safety stock 60, orders 400 at a time.

At which point is the new order placed?

Tap the point that answers the question, then press Check.

The inventory sawtoothLine chart with 6 categories: Day 0: Stock on hand 460, Reorder point 260, Safety stock 60; Day 5: Stock on hand 260, Reorder point 260, Safety stock 60; Day 10: Stock on hand 60, Reorder point 260, Safety stock 60; Delivery: Stock on hand 460, Reorder point 260, Safety stock 60; Day 15: Stock on hand 260, Reorder point 260, Safety stock 60; Day 20: Stock on hand 60, Reorder point 260, Safety stock 60.0100200300400500Day 0Day 5Day 10DeliveryDay 15Day 20
Illustration with steady demand; in real life the teeth are uneven.
The inventory sawtooth
ItemStock on handReorder pointSafety stock
Day 046026060
Day 526026060
Day 106026060
Delivery46026060
Day 1526026060
Day 206026060

Step 8 of 13Learn

How much safety stock?

Safety stock depends on two things: how much demand varies, and how sure you want to be of not running out.

When demand varies but lead time is reliable, a standard formula is:

Safety stock = z × σd × √L

  • σd is the standard deviation of daily demand: a measure of how much demand typically swings around the average.
  • L is the lead time in days. The square root reflects that busy and quiet days partly cancel out over a longer period.
  • z is a factor from the normal distribution that sets the cycle service level, the chance of not running out during a replenishment cycle. Common values: 90% → z ≈ 1.28; 95% → z ≈ 1.65; 99% → z ≈ 2.33.

Example: daily demand averages 40 units with σd = 10, and lead time is 9 days. For 95% service, safety stock = 1.65 × 10 × √9 = 1.65 × 10 × 3 = 49.5, about 50 units.

Notice how costs explode at the top: going from 95% to 99% raises z from 1.65 to 2.33, which is about 41% more safety stock to cut stockouts from 1 cycle in 20 to 1 in 100. Going to 99.9% needs z ≈ 3.09. That's why companies set high service levels for critical or high-margin items and accept lower levels elsewhere.

Step 9 of 13Try the calculator

Safety stock and reorder point calculator

Change the service level factor z, demand variability and lead time. (z: 1.28 for 90%, 1.65 for 95%, 2.33 for 99%.)

Safety stock
50 units
Expected demand during lead time
360 units
Reorder point
410 units

Step 10 of 13Practice · Estimate

Use the calculator: with the same demand (average 40, σd = 10) but a lead time of 16 days, about how many units of safety stock are needed for 95% service (z = 1.65)?

38 units

Step 11 of 13Note

Step 12 of 13Note

Step 13 of 13Practice · Choose one

A company raises its target cycle service level for an item from 95% to 99%, with demand and lead time unchanged. What happens to safety stock?