Find a course

Module 5: Kanban, Metrics and Agile in PracticeLesson 12 of 1213 min

Agile in Practice: Charts, Anti-Patterns and Scaling

Read burndown and burnup charts, recognize anti-patterns like Water-Scrum-Fall and zombie Scrum, and see how Agile scales across teams and beyond software.

Step 1 of 14Learn

"We do Agile"

A company announces that all its teams are now Agile. Teams are renamed, stand-ups are scheduled, and everyone gets sticky notes. Six months later, things look busy but little has changed. Requirements are still fixed a year ahead by a steering committee. Sprints end with half the work unfinished and rolled into the next one. Retrospectives are cancelled because everyone is too busy. Releases still happen twice a year, after a long testing phase.

The ceremonies changed. The way decisions are made didn't. This is so common it has names, and learning to recognize them is as important as learning the framework itself.

This lesson covers three practical topics. First, charts that make progress transparent, so the team and stakeholders can inspect it honestly. Second, the anti-patterns that turn Agile into theater. Third, how Agile works when there's more than one team, or when the work isn't software at all.

The theme throughout is the one from the very first lesson: Agile only works if real feedback leads to real change. Every chart, event and framework is a tool for that. When a tool stops leading to change, it's just overhead.

Step 2 of 14Explore

A sprint burndown chart

A burndown chart shows remaining work on the vertical axis and days on the horizontal axis. Set the sprint's total points and the team's average daily completion rate, and see when remaining work reaches zero. Lower the rate and watch the line miss the end of a 10-day sprint.

0204060 051015
Days to burn down all work
10 days
Points left at the end of a 10-day sprint
0 points

Step 3 of 14Learn

Reading burndown and burnup charts

A burndown chart plots remaining work against time. Many teams draw an ideal line from the total at the start down to zero at the end of the sprint, and update the actual line daily.

Common shapes and what they suggest:

  • Actual line above the ideal line: the team is behind. Discuss at the Daily Scrum whether scope should be renegotiated with the Product Owner.
  • Flat line for several days, then a cliff at the end: work isn't being finished until the last moment, often because items are too large or testing happens at the end. Smaller items and lower WIP smooth it out.
  • Line goes up: work was added mid-sprint, or items were re-estimated larger.
  • Line hits zero early: the team planned too little, or estimates were high.

A burnup chart shows two lines: completed work rising toward a total scope line. Its advantage is that scope changes are visible separately. If the release burnup shows completed work rising steadily but the scope line rising just as fast, the team isn't slow; the target keeps moving. A burndown would hide that.

The Scrum Guide doesn't require any chart. They're optional practices that support transparency. Use them if they help the team inspect and adapt, and drop them if nobody looks at them.

Step 4 of 14Practice · Choose one

A team's sprint burndown stays almost flat for the first eight days of a ten-day sprint, then drops sharply on the last two days. What is the most likely cause?

Step 5 of 14Practice · Chart

Burndown: ideal versus actual

On which day is the team furthest behind the ideal line?

Tap the point that answers the question, then press Check.

Burndown: ideal versus actualLine chart with 11 categories: Day 0: Ideal 40, Actual 40; 1: Ideal 36, Actual 40; 2: Ideal 32, Actual 37; 3: Ideal 28, Actual 37; 4: Ideal 24, Actual 33; 5: Ideal 20, Actual 31; 6: Ideal 16, Actual 26; 7: Ideal 12, Actual 20; 8: Ideal 8, Actual 14; 9: Ideal 4, Actual 9; 10: Ideal 0, Actual 5.010203040Points remainingDay 012345678910
Illustrative 10-day sprint with 40 points.
Burndown: ideal versus actual
ItemIdealActual
Day 04040
13640
23237
32837
42433
52031
61626
71220
8814
949
1005

Step 6 of 14Learn

Anti-patterns to recognize

Water-Scrum-Fall. Requirements and design are fixed up front, development happens in "sprints," and testing and release happen in a long phase afterward. The middle looks Agile; the feedback loop is still a year long.

Zombie Scrum. The team holds every event, but nothing comes alive: no stakeholder ever attends the Sprint Review, Increments are rarely released, and nobody seems to care whether the Sprint Goal is met. Scrum's shape without its purpose.

Sprint as mini-waterfall. Design in week one, build in week two, test on the last day. Items finish together at the end, if at all.

Chronic carry-over. Every sprint ends with unfinished items rolled into the next. This usually signals overcommitment, items that are too big, or a weak Definition of Done.

Scrum Master as project manager, Product Owner as order-taker. Accountabilities become old job titles with new names.

Velocity as a target. Points inflate, and the number loses meaning.

Agile as an excuse. "We're Agile, so we don't plan" or "we don't document." That's not agility, just chaos.

The cure is usually the same: shorten real feedback loops, make work transparent, and use retrospectives to change one thing at a time.

Step 7 of 14Practice · Select all that apply

Which of these are warning signs of "zombie Scrum"? Select all that apply.

Select all that apply.

Step 8 of 14Flashcards

Anti-patterns: name the symptom

Tap a card to flip it.

Step 9 of 14Learn

Scaling: when one team is not enough

Scrum Teams are small by design. When a product needs 30 or 100 people, several teams must work on it together, coordinating dependencies and integrating their work into one Increment.

Several approaches exist:

  • Scrum of Scrums: representatives from each team meet regularly, often daily or a few times a week, to coordinate dependencies and impediments across teams.
  • Nexus: from Scrum.org; three to nine Scrum Teams working on a single product with one Product Backlog, adding a Nexus Integration Team focused on integration.
  • LeSS (Large-Scale Scrum): keeps Scrum as simple as possible at scale, with one Product Owner and one Product Backlog for many teams.
  • SAFe (Scaled Agile Framework): a comprehensive and more prescriptive framework with roles, planning events and portfolio layers for large enterprises.

All of them share some ideas from the Scrum Guide itself: multiple teams working on one product share one Product Goal, one Product Backlog and one Product Owner, and they integrate their work into a single Increment.

A practical warning: scaling multiplies whatever you already have. If one team struggles with Scrum, ten teams will struggle more. Most experienced coaches advise getting a single team working well first, and reducing dependencies between teams before adding coordination layers.

Step 10 of 14Practice · Match the pairs

Match each scaling approach to its description.

Tap an answer, then tap the place where it belongs (or drag it there).

  1. Scrum of Scrums
  2. Nexus
  3. LeSS
  4. SAFe

Step 11 of 14Diagram

Scaling approaches, from light to heavy structure

Scaling approaches, from light to heavy structureScale: Scrum of Scrums, Nexus, LeSS, SAFe.LighterHeavier02468101Scrum of Scrums3.5Nexus5LeSS9SAFe

Tap a shape with to see more.

Positions show relative amount of added structure, not a precise measure.
Scrum of Scrums

A regular coordination meeting of team representatives.

Nexus

3 to 9 Scrum Teams plus an integration team, one Product Backlog.

LeSS

Large-Scale Scrum: one Product Owner, one backlog, minimal extra roles.

SAFe

A full enterprise framework with portfolio, program and team levels.

Step 12 of 14Learn

Agile beyond software

Agile began in software, but the underlying problem, doing valuable work under uncertainty, is everywhere.

Marketing teams use sprints to run campaigns as experiments: launch a small version, measure results, and put more budget into what works. A backlog holds campaign ideas ordered by expected impact.

HR teams use Kanban boards to track hiring pipelines and onboarding tasks, with WIP limits so recruiters aren't juggling 30 candidates each.

Research and product design teams use short iterations to prototype and test with users before committing to a direction.

Schools and universities use visible boards and retrospectives for course development and student projects.

What transfers well: short cycles, visible work, limiting WIP, regular reviews with the people you serve, and retrospectives. What needs adapting: terms like software and developer, and the idea of an Increment, which might be a published campaign, a revised policy or a tested prototype.

If you want to try Agile on your own team, start small. Make the work visible on a board, agree on a short cycle, hold a short review with stakeholders at the end, then a retrospective. Change one thing at a time based on what you learn.

Step 13 of 14Practice · What would you do?

What would you do?

Senior leadership wants a monthly dashboard ranking all twelve Scrum Teams by velocity, to identify the most productive ones. As a Scrum Master, how do you respond?

Step 14 of 14Practice · Choose one

A team says it is Agile. Requirements are fixed a year ahead, development happens in two-week sprints, and everything is tested and released together at the end of the year. Which anti-pattern is this?