Find a course

Module 2: Lean Tools for FlowLesson 4 of 1213 min

5S, Kanban, Mistake-Proofing and Quick Changeover

Organize workplaces with 5S, pull work with kanban, prevent errors with poka-yoke, cut setups with SMED, and improve daily with kaizen and PDCA.

Step 1 of 13Learn

5S: a place for everything

Before you can improve a process, you need a workplace where problems are visible. 5S is a method for organizing any work area, from a machine shop to a shared drive:

  1. Sort (seiri): remove everything not needed for the current work. Red-tag doubtful items and move them to a holding area; if nobody claims them in a few weeks, get rid of them.
  2. Set in order (seiton): give every needed item a marked home, close to where it's used, with the most frequently used items easiest to reach. Shadow boards outline each tool so a missing one is obvious.
  3. Shine (seiso): clean the area and equipment, and inspect while cleaning. An oil leak spotted during cleaning is a breakdown prevented.
  4. Standardize (seiketsu): write down the standards (photos, checklists, labels) so everyone keeps the area the same way.
  5. Sustain (shitsuke): build the habit with short audits, visual scores and leadership attention.

Some organizations add a sixth S for Safety.

The benefits are concrete: less time searching (studies of office and shop workers often find people lose several minutes an hour hunting for tools, files or information), fewer errors, safer workplaces and easier training. The most common failure is treating 5S as a one-day cleanup. Without Standardize and Sustain, most areas drift back to the old state within months.

Step 2 of 13Practice · Put in order

Put the 5S steps in order.

Drag the items, or use the arrow buttons, to put them in order.

  1. Standardize
  2. Set in order
  3. Sort
  4. Shine
  5. Sustain

Step 3 of 13Diagram

The 5S cycle

The 5S cycleCycle diagram: Sort → Set in order → Shine → Standardize → Sustain.Problems becomevisibleSortSet in orderShineStandardizeSustain

Tap a shape with to see more.

Sort

Remove what is not needed (red-tag it).

Set in order

A labeled place for everything, nearest the point of use.

Shine

Clean and inspect; dirt hides leaks and wear.

Standardize

Write down and share the new normal.

Sustain

Audits and habits so it does not slide back.

Step 4 of 13Learn

Kanban: pull instead of push

In a push system, each step makes as much as it can and pushes it to the next step, whether it's needed or not. Piles grow in front of slow steps, and the wrong items get made.

In a pull system, a step makes something only when the next step (ultimately the customer) signals a need. The classic signal is a kanban (Japanese for signboard or card). Here's how a simple two-bin kanban works for screws on an assembly line: the worker uses screws from bin one; when it's empty, the bin itself, with its card, goes back to the stockroom as the signal to refill. Meanwhile the worker uses bin two. Production and stocking happen only in response to real use.

The number of kanban cards in the loop sets the maximum inventory. Remove a card and inventory drops; problems that the extra stock was hiding, such as unreliable machines or long setups, come to the surface where they can be fixed.

Kanban boards in knowledge work apply the same idea: columns for To do, In progress and Done, with WIP limits on the in-progress columns. If the limit is 3 and three items are in progress, nobody starts new work; they help finish what's stuck. Remember Little's Law: lower WIP means shorter lead times.

Step 5 of 13Practice · True or false

In a kanban system, adding more kanban cards to a loop increases the maximum inventory that can build up.

Step 6 of 13Compare

Push vs pull

AspectPushPull (kanban)
What triggers workA forecast or scheduleA signal that the next step used something
InventoryPiles up in front of slow stepsCapped by the number of kanban cards
ProblemsHidden under stockExposed quickly
Office exampleEveryone starts every new requestWIP limit: start new work only when a slot frees up

Step 7 of 13Tap to reveal

Four more core Lean tools

  1. Poka-yoke (mistake-proofing)

    Design the process so errors can't happen or are caught instantly. Examples: a USB-C plug that fits either way, a car that won't shift out of park unless the brake is pressed, a form that won't submit with an invalid date, a parts tray with exactly one slot per part so a missing screw is obvious.

  2. SMED (quick changeover)

    Single-Minute Exchange of Die: a method for cutting setup time when switching a machine or process from one product to another. Separate internal steps (done while the machine is stopped) from external steps (done while it runs), move as much as possible to external, then streamline the rest. Setups that took hours often drop to minutes, which makes small batches affordable.

  3. Standard work

    The current best known way to do a task, written down with its sequence, timing and the amount of WIP needed. It isn't a rule carved in stone; it's the baseline for improvement. Without a standard, you can't tell whether a change helped.

  4. Jidoka and andon

    Jidoka means building in quality by stopping when something goes wrong, rather than passing defects on. An andon is the signal (a cord, button or light) that any worker can use to call for help or stop the line when they see a problem.

Step 8 of 13Practice · Match the pairs

Match each situation to the Lean tool that addresses it.

Tap an answer, then tap the place where it belongs (or drag it there).

  1. A machine takes 3 hours to switch between products, so the plant runs huge batches
  2. Workers sometimes install a part upside down
  3. Tools are scattered and workers waste time searching
  4. Upstream steps keep making parts nobody downstream needs yet

Step 9 of 13Learn

Kaizen and PDCA: improvement every day

Kaizen means change for the better: continuous, incremental improvement by everyone, every day. Instead of waiting for a big project, frontline staff spot small problems and fix them. Many small changes, such as moving a printer, relabeling a shelf or removing a needless form field, add up to large gains over a year.

Organizations also run kaizen events (or rapid improvement events): a focused team spends three to five days on one process, mapping it, testing changes on the spot and implementing what works by the end of the week.

The engine behind kaizen is the PDCA cycle (Plan, Do, Check, Act), associated with quality pioneers Walter Shewhart and W. Edwards Deming:

  1. Plan: understand the problem, propose a change and predict its effect.
  2. Do: try the change on a small scale.
  3. Check: measure the results and compare them with the prediction. (Deming preferred Study, giving PDSA.)
  4. Act: if it worked, adopt it as the new standard; if not, learn and try something else. Then repeat.

PDCA and DMAIC share the same logic, a scientific method applied to work. PDCA is lighter and faster for small daily improvements; DMAIC is more rigorous for complex problems where the cause is unknown and data analysis is needed.

Step 10 of 13Practice · Fill in the blanks

Fill in the blanks

In the PDCA cycle, after trying a change on a small scale in the step, you measure and compare the results with your prediction in the step, and then make the change standard or try again in the step.

Step 11 of 13Diagram

PDCA: the engine of kaizen

PDCA: the engine of kaizenCycle diagram: Plan → Do → Check (Study) → Act.RepeatPlanDoCheck (Study)Act

Tap a shape with to see more.

Plan

Describe the problem, pick a change and predict its effect.

Do

Try it on a small scale.

Check (Study)

Compare the results with your prediction.

Act

Standardize it, adjust it, or drop it and plan again.

Step 12 of 13Note

Step 13 of 13Practice · What would you do?

What would you do?

A print shop runs each job in big batches because changing plates and ink on its main press takes 90 minutes. Customers wait over a week for small orders, and stacks of printed stock fill the back room. What should the shop try first?