What Is Lean Six Sigma?

Learn how Lean removes waste and Six Sigma reduces variation, what 3.4 defects per million means, and how the DMAIC method structures improvement.

Step 1 of 11Learn

Two clinics, same staff, different results

Two outpatient clinics in the same city have the same number of doctors and nurses and see similar patients. At Clinic A, the average visit takes 2 hours and 10 minutes from check-in to checkout, of which about 15 minutes are spent with a clinician. Patients wait in the lobby, wait in the exam room, wait for a lab result that sits in a printer tray, and wait again at checkout. About 1 in 12 bills has an error and has to be redone.

At Clinic B, the visit takes 50 minutes. Staff mapped the patient flow, removed duplicate paperwork, moved the lab printer next to the nurses' station, and standardized the billing codes that caused most errors. Bill errors fell to fewer than 1 in 200. No one works harder at Clinic B; the work is just designed better.

That's what Lean Six Sigma does: it improves processes by combining two approaches.

  • Lean focuses on speed and flow: removing waste, the steps and delays that add no value for the customer.
  • Six Sigma focuses on quality and consistency: reducing variation so that the process produces the same good result every time, with very few defects.

One makes the process faster; the other makes it reliable. Together they make it faster and better, which usually also makes it cheaper.

Step 2 of 11Chart

Two clinics: minutes per visit

Stacked up, the clinician time is the same. Everything Clinic B removed was waiting.

Two clinics: minutes per visitStacked bar chart with 2 categories: Clinic A: Time with a clinician 15, Waiting and other steps 115; Clinic B: Time with a clinician 15, Waiting and other steps 35.050100150MinutesClinic AClinic B13050
From the example above; Clinic B is assumed to keep the same 15 minutes of clinician time.
Two clinics: minutes per visit
ItemTime with a clinicianWaiting and other steps
Clinic A15115
Clinic B1535

Step 3 of 11Learn

Where the ideas came from

Lean grew out of the Toyota Production System, developed in Japan from the 1950s onward by engineers such as Taiichi Ohno. Toyota couldn't afford the huge inventories and long production runs of American carmakers, so it learned to make small batches, pull work only when needed, and attack every form of waste. Researchers studying Toyota in the late 1980s coined the word lean, and the book Lean Thinking (1996) summed up five principles: define value from the customer's view, map the value stream, make work flow, let customers pull, and pursue perfection.

Six Sigma began at Motorola in the mid-1980s, where engineers set a goal of near-perfect quality and built a statistical, project-based method to reach it. General Electric made it famous in the late 1990s by training thousands of managers and reporting large savings. The name comes from statistics: sigma (σ) is the symbol for standard deviation, a measure of variation. A process running at six sigma quality produces about 3.4 defects per million opportunities.

In the 2000s, many organizations merged the two into Lean Six Sigma, recognizing that a fast process full of defects isn't good, and neither is a perfect process that takes weeks. Today it's used far beyond factories: in hospitals, banks, software teams, call centers, government offices and logistics.

Step 4 of 11Practice · Sort into groups

Sort each idea by the approach it comes from.

Tap an item, then tap its group (or drag it there).

Step 5 of 11Compare

Lean and Six Sigma side by side

AspectLeanSix Sigma
Main questionWhere is time and effort wasted?Why does the result vary, and what causes defects?
Main goalFaster flow, less wasteFewer defects, consistent output
Typical toolsValue stream maps, 5S, kanban, quick changeoverDMAIC, control charts, capability analysis, hypothesis tests
Typical resultLead time cut from days to hoursError rate cut from 5% to 0.1%
StyleMany small, quick improvements by frontline teamsStructured projects led by trained specialists

Step 6 of 11Learn

DMAIC: the improvement roadmap

Lean Six Sigma projects usually follow five phases called DMAIC (pronounced duh-MAY-ick):

  1. Define: What's the problem, who is the customer, what matters to them, and what's the goal? Output: a project charter.
  2. Measure: How does the process perform today? Collect reliable data and set a baseline, such as an error rate of 4.2% or an average lead time of 6 days.
  3. Analyze: What are the root causes? Use data to confirm which factors actually drive the problem, instead of guessing.
  4. Improve: Design, test and implement solutions that fix the confirmed root causes, often starting with a small pilot.
  5. Control: Lock in the gains with standard procedures, monitoring and a response plan, so the process doesn't drift back.

The discipline of DMAIC is its main strength. Many teams jump straight from a problem to a solution, such as buy new software, without measuring the problem or proving the cause. DMAIC forces the question how do we know? at every step.

For designing a brand-new process or product rather than fixing an existing one, a variant called DMADV (Define, Measure, Analyze, Design, Verify), also known as Design for Six Sigma, is used.

Step 7 of 11Practice · Put in order

Put the DMAIC phases in order.

Drag the items, or use the arrow buttons, to put them in order.

  1. Define
  2. Measure
  3. Improve
  4. Analyze
  5. Control

Step 8 of 11Practice · Diagram

DMAIC and what each phase produces

In which phase does a team prove which causes really drive the problem? Tap it.

Tap the shape that answers the question, then press Check.

DMAIC and what each phase producesProcess diagram: Define → Measure → Analyze → Improve → Control.DefineMeasureAnalyzeImproveControl
Define

Output: a project charter with the problem, customer, goal and scope.

Measure

Output: reliable baseline data on how the process performs today.

Analyze

Output: root causes proven with data, not opinions.

Improve

Output: tested solutions that remove those causes.

Control

Output: control charts, standards and a reaction plan so gains last.

Step 9 of 11Note

Step 10 of 11Practice · Choose one

A bank's loan approvals take 12 days on average, but the decisions themselves are almost always correct. Which approach should lead the improvement effort?

Step 11 of 11Practice · True or false

A process operating at six sigma quality produces about 3.4 defects per million opportunities.