Customer Value and the Eight Wastes
Separate value-added from non-value-added work, and learn to spot the eight wastes of Lean in offices, hospitals and factories using DOWNTIME.
Welcome back!
Step 1 of 12Learn
Would the customer pay for this?
Lean starts with one question: what does the customer value? Value is anything the customer would willingly pay for if they could see it happen. Every step in a process falls into one of three groups:
- Value-added (VA): changes the product or service in a way the customer wants, is done right the first time, and the customer would pay for it. Cooking a meal, repairing a car, a doctor diagnosing a patient.
- Business non-value-added (BNVA), also called necessary waste: the customer wouldn't pay for it, but it's required today, by law, by safety rules or by current technology. Tax filings, safety inspections, some approvals.
- Non-value-added (NVA), or pure waste: adds nothing and isn't required. Waiting, searching, re-entering data, fixing mistakes, moving things back and forth.
When teams first classify the steps in a typical service or office process, they're often surprised: value-added time is commonly only a small percentage of the total, sometimes under 5%. The rest is waiting, checking, moving and redoing.
That's good news, because it means big gains are available without anyone working faster. The aim is to remove NVA steps, minimize BNVA steps, and improve VA steps. Speeding up value-added work is usually the hardest and least rewarding option; removing waiting is easier and often far more effective.
Step 2 of 12Practice · Sort into groups
A customer orders a custom bicycle online. Classify each step.
Tap an item, then tap its group (or drag it there).
Step 3 of 12Chart
Where the time goes in a typical unimproved process
| Item | Share of lead time |
|---|---|
| Value-added | 5% |
| Business non-value-added | 15% |
| Non-value-added (waste) | 80% |
Step 4 of 12Learn
The eight wastes: DOWNTIME
Toyota originally named seven wastes (in Japanese, muda). Lean practitioners later added an eighth. A handy memory aid is DOWNTIME:
- Defects: errors, rework, scrap, wrong information. A mistyped address that sends a parcel back.
- Overproduction: making more, or sooner, than needed. Printing 500 brochures when 200 are used. Toyota considered this the worst waste, because it creates most of the others.
- Waiting: people, machines or information idle while waiting for the next step. A patient waiting for test results.
- Non-utilized talent: not using people's skills, ideas and knowledge. Engineers doing data entry; frontline staff never asked how to improve.
- Transportation: moving materials, products or documents unnecessarily. Shipping parts between buildings for each step.
- Inventory: more materials, work in progress or finished goods than needed. Hundreds of unread emails count too.
- Motion: unnecessary movement of people, such as walking, reaching, searching. A nurse walking a mile per shift to fetch supplies.
- Extra-processing: doing more than the customer requires. Three approval signatures where one would do; polishing a part's hidden surface.
The difference between transportation and motion confuses many people: transportation moves things; motion is movement of people (or machines) while doing the work.
Step 5 of 12Practice · Match the pairs
Match each example to the waste it represents.
Tap an answer, then tap the place where it belongs (or drag it there).
- A report is printed, signed, scanned and emailed back
- A finished batch of forms sits for two days before the next step
- A technician walks across the shop five times an hour to get tools
- A bakery bakes 300 loaves when 180 sell
- Invoices sent with wrong prices must be reissued
Step 6 of 12Flashcards
DOWNTIME: the eight wastes
Tap a card to flip it.
Step 7 of 12Note
Step 8 of 12Learn
Waste in offices and services
Waste is easy to see in a factory: piles of inventory, forklifts carrying parts back and forth. In offices and services it hides inside computers and inboxes, but it's just as real.
Take an insurance claims department. Inventory is the queue of 2,000 unopened claims. Waiting is a claim sitting for four days until a supervisor approves it. Defects are claims returned because a form field was blank. Transportation is a file emailed between five departments. Motion is an adjuster clicking through seven systems to find one policy number. Extra-processing is a report nobody reads, produced every week. Overproduction is sending the same letter by mail and email. Non-utilized talent is an experienced adjuster who knows how to fix the form but has never been asked.
Two other Japanese terms round out the picture. Mura means unevenness: workloads that swing from overload on Monday to idle on Thursday. Muri means overburden: pushing people or equipment beyond reasonable limits. Uneven work (mura) often leads to overburden (muri) on busy days, which leads to defects and other waste (muda). Smoothing the workload is often a powerful first step.
A common mistake is treating waste removal as cost cutting or headcount reduction. In Lean, the goal is to free people's time for value-added work, and most successful programs promise that no one will lose their job because of an improvement.
Step 9 of 12Diagram
Mura, muri, muda
Tap a shape with to see more.
- Mura: unevenness
Overload on Monday, idle on Thursday.
- Muri: overburden
Busy days push people and equipment past reasonable limits.
- Muda: waste
Overburden produces defects, rework and delays, which make the next day uneven too.
Step 10 of 12Practice · Select all that apply
In a hospital pharmacy, which of these are examples of waste? Select all that apply.
Select all that apply.
Step 11 of 12Practice · True or false
In Lean, transportation waste and motion waste mean the same thing.
Step 12 of 12Practice · What would you do?
What would you do?
An accounts payable team wants to cut costs. A manager suggests making clerks type faster by setting a keystrokes-per-hour target. A process review shows invoices spend an average of 9 days in the process, of which about 20 minutes is actual work. What should the team focus on?