Find a course

Module 4: Analyze and ImproveLesson 10 of 1213 min

Improve: Choosing, De-risking and Piloting Solutions

Generate solutions for verified root causes, prioritize them with an impact-effort matrix, reduce risk with FMEA, and prove them with a pilot.

Step 1 of 11Learn

From root cause to solution

With root causes confirmed by data, the Improve phase finds and implements solutions. The trap here is falling in love with the first idea. Good teams generate many options before choosing.

Useful ways to generate solutions:

  • Brainstorming: quantity first, no criticism during the session, build on others' ideas.
  • Benchmarking: how do other departments, companies or industries solve similar problems? Hospitals have borrowed checklists from aviation and patient handoff methods from racing pit crews.
  • Lean principles: can we eliminate the step, combine steps, change the sequence or simplify? Can we mistake-proof it?
  • Asking the people who do the work: they usually already know several fixes.

Then narrow the list. An impact-effort matrix (also called a PICK chart) plots each idea on two axes:

  • High impact, low effort: quick wins. Do them now.
  • High impact, high effort: major projects. Plan them carefully.
  • Low impact, low effort: fill-ins. Do them if time allows.
  • Low impact, high effort: avoid.

For bigger decisions, a weighted criteria matrix scores each solution on factors such as effect on the root cause, cost, time to implement, risk and acceptance by staff.

The best solutions usually fix the cause at the source. Adding an inspection step to catch errors is a weak fix; redesigning the form so the error can't happen is a strong one.

Step 2 of 11Practice · Sort into groups

Place each improvement idea for a slow clinic check-in in the impact-effort matrix.

Tap an item, then tap its group (or drag it there).

Step 3 of 11Diagram

The impact-effort matrix

The impact-effort matrixTwo-by-two matrix: Quick wins, Major projects, Fill-ins, Avoid.Quick winsMajor projectsFill-insAvoidEffortLowHighImpactLowHigh

Tap a shape with to see more.

Quick wins

Do these first.

Major projects

Worth planning carefully.

Fill-ins

Do if time allows.

Avoid

Lots of work for little gain.

Step 4 of 11Learn

FMEA: what could go wrong?

Every solution changes the process, and changes can create new failures. Failure mode and effects analysis (FMEA) is a structured way to think ahead.

For each step of the new process, the team lists:

  • Failure mode: how could this step fail? (Patient enters the wrong date of birth online.)
  • Effect: what happens if it does? (Records mismatch; wrong patient file opened.)
  • Cause: why might it happen? (Free-text date field, different date formats.)

Then they rate each failure mode on three 1–10 scales:

  • Severity (S): how bad is the effect? 10 = catastrophic or safety-critical.
  • Occurrence (O): how likely is the cause? 10 = almost certain.
  • Detection (D): how likely is it that the failure escapes current controls? 10 = almost impossible to detect before it reaches the customer. Note that a high detection score is bad.

Multiply them: Risk priority number (RPN) = S × O × D, from 1 to 1,000. The team acts first on the highest RPNs, and on anything with very high severity regardless of RPN. For the date-of-birth example, S = 8, O = 5, D = 6 gives RPN = 240. Adding a date picker (cutting O to 2) and a confirmation screen (cutting D to 3) brings it down to 8 × 2 × 3 = 48.

Newer FMEA guidance uses action priority tables instead of raw RPN in some industries, but the logic of rating severity, occurrence and detection is the same.

Step 5 of 11Try the calculator

RPN calculator

Rate a failure mode from 1 to 10 on each scale. Remember: a high detection score means the failure is hard to catch.

Risk priority number
240

Step 6 of 11Practice · Work it out

A failure mode is rated severity 7, occurrence 4 and detection 5. After a mistake-proofing change, occurrence drops to 1 and detection to 2. By how much does the RPN fall?

Step 7 of 11Learn

Pilot before you roll out

Even a well-analyzed solution can surprise you in practice. A pilot tests it on a small scale: one shift, one ward, one branch, one product line, for long enough to see real results.

A good pilot:

  • has a clear prediction: we expect check-in time to fall from 18 to under 8 minutes;
  • measures the same metrics as the baseline, with the same operational definitions, so you can compare fairly;
  • tracks counterbalancing metrics to catch side effects (did data errors rise when check-in got faster?);
  • includes the people who'll use it, and gathers their feedback;
  • runs long enough to include normal variation, such as busy and quiet days.

After the pilot, compare before and after with data, ideally with a hypothesis test, to confirm the improvement is real and not chance. If it works, plan the full rollout: training, updated procedures, communication, timing and who's responsible. If it doesn't, you've learned something cheaply, which is the point of piloting.

Also calculate the business benefit. Hard savings show up directly in the financial results: lower scrap, less overtime, reduced outside spending. Soft savings are real but indirect: time freed for other work, cost avoidance, better customer satisfaction. Finance teams usually validate hard savings, so agree on the method with them early.

Step 8 of 11Practice · Put in order

Put these Improve-phase steps in a sensible order.

Drag the items, or use the arrow buttons, to put them in order.

  1. Roll out the solution fully with training and new procedures
  2. Pilot the solution on a small scale and measure results
  3. Prioritize them with an impact-effort or criteria matrix
  4. Generate many possible solutions for the verified root causes
  5. Run an FMEA on the chosen solution

Step 9 of 11Diagram

The Improve phase at a glance

The Improve phase at a glanceProcess diagram: Generate options → Prioritize → FMEA the choice → Pilot small → Roll out.Generate optionsPrioritizeFMEA the choicePilot smallRoll out

Tap a shape with to see more.

Generate options
Prioritize
FMEA the choice

Ask what could go wrong before it does.

Pilot small

Predict, test, compare.

Roll out

Only after the pilot shows the gain.

Step 10 of 11Note

Step 11 of 11Practice · Choose one

Which solution most strongly addresses the root cause "nurses sometimes give the wrong dose because two drugs have similar names and packaging"?